BGIS · Government
AHU fan upgrade — Parramatta Local Court
We upgraded the court's air handling units to an EC plug fan wall, working around court sittings. EC plug fans use less energy, run quieter and need less maintenance than traditional fans.
-
BGIS · Government
Fire damper rectification — government buildings
We inspected, repaired and replaced faulty fire dampers across government buildings, adding access panels where dampers couldn't be reached, and recorded every damper for the buildings' fire safety records.
-
SummitCare · Aged care
Air conditioning replacement program
A staged program replacing around 300 air conditioning units across SummitCare homes in NSW, planned room by room so residents stayed comfortable and care routines carried on.
-
SummitCare · Aged care
Plant room acoustic upgrade
We reduced plant room noise reaching residents and staff with an acoustic upgrade to the plant room.
-
Knight Frank · Commercial
Chiller upgrades and corrosion protection
Chiller upgrades together with cathodic protection and ceramic coating, protecting the plant from corrosion and extending its working life.
-
Belvedere Apartments · Residential
Water-cooled package unit and LED retrofit
Replacement of the building's water-cooled package unit, plus an LED lighting retrofit to cut energy use.
-
Commercial building
Chiller plant rectification
The chiller kept tripping on high pressure. We rewired and commissioned the condenser fan VSDs, reprogrammed the BMS — variable flow, differential pressure control, lead/lag and leaving-water temperature reset — and fixed a flow fault, so the plant now runs without trips.